JNS janus electric holdings limited

anyone topping up today?, page-18

  1. 2,598 Posts.
    lightbulb Created with Sketch. 777
    From the REDP information guide -

    3

    3.2. Project eligibility

    3.2.1. Large-scale renewable energy demonstration project for power
    generation meeting the objective and outcomes of REDP
    To be eligible a project must be a large-scale demonstration renewable energy
    project for power generation located in Australia. The program is designed to fill
    the gap between post-research and commercial uptake. Consequently, the
    REDP is targeted at project proposals that are relatively mature and are at the
    stage of commercial demonstration.

    Demonstration is taken to be the final step to address remaining technology risks
    around integration and scale-up of the technology, once the technology has been
    proven at pilot plant scale. The project should be able to achieve specified
    performance outcomes and reliability standards such that commercial roll out of
    the technology becomes "bankable". The appropriate scale for a demonstration
    project will vary depending on the generation technology.''


    Still think we have a chance of a grant ? Only if they change the eligibility criteria.



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
16.0¢
Change
-0.015(8.57%)
Mkt cap ! $14.38M
Open High Low Value Volume
18.0¢ 18.0¢ 16.0¢ $13.69K 79.89K

Buyers (Bids)

No. Vol. Price($)
1 5000 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
18.0¢ 127725 3
View Market Depth
Last trade - 13.01pm 15/07/2025 (20 minute delay) ?
JNS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.