Interesting stuff, just looking around on the net and came across previous results of Warro 1 & 2 tests. We are streets ahead even at the moment !!!
Testing in 1977 of two zones on Warro-2, after fracture stimulation with water based fluids, flowed 80 Mcf/d and 104 Mcf/d respectively. Since the 1990s there has been a step-change in fracture stimulation and completion technology for tight gas fields. In 2007, Latent commissioned Schlumberger’s USA based fracture stimulation team to evaluate all available data to amongst other things, determine the likely range of production outcomes from development wells. Schlumberger reported that vertical wells into the Warro Field are expected to yield in excess of 6 Bcf each with an initial rate >6.5 MMcf/d while horizontal wells may produce upwards of 20 Bcf with an initial rate of >25 MMcf/d.
Interesting reading !!
- Forums
- ASX - By Stock
- TSV
- comparision with warro 1 & 2
comparision with warro 1 & 2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)