@OT1961 ..."The other important work is the flow sheet for the plant design."
Surely with the small starter mine, with limited ore we would not be doing any building of plant. My concept was that the ore would be shipped to whichever existing plant, probably Western Areas as they would be 25% owners anyway, using their existing plant and processes.
This all comes back to how much ore people think we have for the 'starter mine'. I haven't tried to add all the pods up in the 450m X 50m X 80m area the company has mapped out for the pit, but there are holes in there with NSI results, especially just East of MAD71.
It would be interesting to know what people's expectations are tonnage wise for the starter pit.
- Forums
- ASX - By Stock
- SGQ
- Ann: Drilling Update for Mt Alexander
Ann: Drilling Update for Mt Alexander, page-120
-
- There are more pages in this discussion • 70 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.21M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SGQ (ASX) Chart |
Day chart unavailable