MNS 0.00% 4.2¢ magnis energy technologies ltd

[Master Thread] Social Media, page-43

  1. 978 Posts.
    lightbulb Created with Sketch. 56
    Groins,
    Cost for Townsville stage 1 (6GW) per feasibility study was A$1.12B per last years Annual Report presentation
    As stated above the $5B / GW of production was a peer comparison MNS gave of a current battery producer with plans of expanding production
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.