I believe once the permit is finalised, CGB will need a report that goes a little like this.
1. Who's stocking the product.
2. Cost of the unit's
3. Let's have a continuous stock ready
4. Who's going to take control of the Asia sales and who.
5. Basically all the ins and outs.
Good Luck to ALTH
Add to My Watchlist
What is My Watchlist?