I believe once the permit is finalised, CGB will need a report that goes a little like this.
1. Who's stocking the product.
2. Cost of the unit's
3. Let's have a continuous stock ready
4. Who's going to take control of the Asia sales and who.
5. Basically all the ins and outs.
Good Luck to ALTH