STX 0.00% 19.5¢ strike energy limited

Ann: West Erregulla Update, page-39

  1. 146 Posts.
    lightbulb Created with Sketch. 16
    I find it intriguing that after 300m of drilling and only halfway through a reservoir, this was determined to be a good point to pull out and run wireline logs over half a reservoir. Why not drill out this reservoir section and then run logs prior to drilling on to primary target?

    My guess is either something happened to the BHA that required a manual alteration (I don't think a bit dulls after 300m) or they saw something on LWD or at the shakers they they want a closer look at ASAP.

 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
0.000(0.00%)
Mkt cap ! $558.7M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 2720 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
18.5¢ 40553 2
View Market Depth
Last trade - 16.20pm 30/08/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.