I just looked at the presentation.
Looks totally stuffed $200M CAPEX for a 3MTPA operation thats $70 a ton in CAPEX for low grade Fe2O3 in Africa
sorry but no thanks looks like they have signed their death warrant with that presentation who would bank roll that?
Add to My Watchlist
What is My Watchlist?