UEC proposes to develop a small conventional underground uranium mine called the Daneros Mine.... No ore processing would occur at the site. Mining would continue through 2016. The total amount of uranium ore proposed for extraction is 100,000 tons. Mining would begin once all authorizations (required bond, water rights, etc.) are received.'
and:
p30 of Pdf or p10 of report:
'Total mine production would be 100,000 tons of ore. Ore production would average less than 1,200 tons per month over the seven-year mine operation.'
Isn't that 100,000 tonnes or 600,000approx pounds in total Tibbs?