CDT 20.0% 0.4¢ castle minerals limited

Ann: Aeromagnetic Survey Commences at Beasley Creek, page-44

  1. 291 Posts.
    lightbulb Created with Sketch. 198
    I was curious too, so I looked up the rego. number. Testimonials on the magspec.com.au site say that the data is ‘on their desk’ about a week after the survey is flown. Terra Resources will process/interpret that data, so my guess is about 2.5 weeks, maybe longer b/c Easter, until CDT has the images. 2,323 line km @ about 100m would probably take a couple of days to fly - Magpec say their planes have 8hr ‘endurance.’ The aircraft pictured in the announcement (VH HHJ) is a Cessna 210M.

    It’s an cheap way to explore + should help guide drill placement. It has taken a while but we’re here - the conglomerate gold story continues.

    from wiki:
    Cessna 210M Centurion / Turbo Centurion A 210L with an optional 310 hp (231 kW) TSIO-520-R engine and minor changes, produced 1977-80, 1381 built.

    https://hotcopper.com.au/data/attachments/3066/3066097-71876a3357ee9519758ff037043df9bb.jpg


    https://hotcopper.com.au/data/attachments/3066/3066095-941adfd9f8a64c6a805b15f54b476a5e.jpg
 
watchlist Created with Sketch. Add CDT (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $5.311M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $15.57K 3.892M

Buyers (Bids)

No. Vol. Price($)
23 15114998 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 3123800 2
View Market Depth
Last trade - 14.10pm 08/08/2024 (20 minute delay) ?
CDT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.