There is a lot of land to test and they only have one onsite I thought... I was thinking a minimum of 3 months of testing to be tested along the coast especially with the recently applied tenements north of our current tenements that are approved.... Would havego PRL to leave the trailer in one spot for a week I would of thought to get a median of information for the study to be completed.... I dare say that trailer will be placed at 5 or 10k intervals or something along the cost to test mainly the wind and the sun will be the same on all our tenements I reckon....
Prl chart, page-277
-
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable