Westcott, hoping you might be able to answer the following questions on this topic.
1. The biggest CAPEX cost is for the Rail. Is there a chance this cost will be shared, or will SDL have to fit the entire bill.
2. Do you see 50MTPA being the maximum that they could produce, or could it be larger?
3. They have reported a total of 2540MT so far. Is there potential for this figure to be much greater, if so how, by how much?