Mine would need to be pumped out and inspected but once you submerge mesh work its done with, Quite expensive to replace plus emergency ladder / electrics / ventalation ect , But also as indicated almost no infrastructure left on site , Would need remote camp due to its location , and grades are nothing in comparison to ST plus need to be trucked due to grade to BS and you would need plant running to concentrate it before shipping , Best to leave this site till money coming in and use IT to extend mine life with its grade levels.
- Forums
- ASX - By Stock
- POS
- Podeidon Nickel (POS) - Production of Battery Grade Nickel
Podeidon Nickel (POS) - Production of Battery Grade Nickel, page-51
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(14.6%) |
Mkt cap ! $14.85M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $17.92K | 4.496M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 23231764 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 3613686 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
30 | 22965764 | 0.003 |
17 | 34799894 | 0.002 |
3 | 54500000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 3613686 | 4 |
0.005 | 7704601 | 13 |
0.006 | 4405028 | 8 |
0.007 | 19944360 | 10 |
0.008 | 5000000 | 1 |
Last trade - 14.46pm 05/08/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |