Realistically Zeff has until the end of July to deliver the MRE to still be able to hit his performance rights. Assuming it takes 6 weeks to incorporate the last lot of drills into the MRE. The cut off date for drills to be included in the MRE is the 16/6/2021. So we have have approximately another 9 more weeks of drilling (approximately another 45 Holes) and need to make sure these are quality holes that bode well with the resource model.
I think the 45 holes will be mainly concentrated in the area of Blue Below. The Pink area highlights the areas likley to be included in the final MRE based on today's ann. Also have to remember that We are also focused on an area south in the main deposit because we found some good high grade stuff there.
- Forums
- ASX - By Stock
- FM3
- Ann: General Security Agreement
FM3
firstmac mortgage funding trust no. 4 series 1-2020
Ann: General Security Agreement, page-701
-
- There are more pages in this discussion • 206 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FM3 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $0 |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |