FBR 14.6% 4.7¢ fbr ltd

What is Mike Pivac Doing? Something? Anything?, page-515

  1. 1,811 Posts.
    lightbulb Created with Sketch. 173
    Hadrian is designed to pull up and stay in position on a standard residential build, this is how it work and has been shown to work. Most new home sites or subdivisions would accommodate this, no different to having a concrete pumping truck or trucks pulling up on your front verge .
    it is very obvious there will be situations the HX is not suited for.
    Your talkn about not having enough room to work , Im sure you have seen this yourself but Ive been jobs when big ass cranes pull up on front verges or in the street and drop a bigger fu#k ass big pool straight over the roof into a hole in the backyard no probs and much much smaller than Hadrian , and that's in fully established residential.
    Point is , i don't think the Hadrian will have too many problems when building on sites its designed for. I think you might be cherry picking sites that Hadrian wasn't ever designed for anyway.
    Peace
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
0.006(14.6%)
Mkt cap ! $208.7M
Open High Low Value Volume
4.3¢ 4.9¢ 4.0¢ $1.290M 29.35M

Buyers (Bids)

No. Vol. Price($)
2 71031 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 220000 3
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.