19 FEB 2021 Presentation:
DFS/ESIA - 2021
Demo plant onsite - H2 2021
Ann 17 MAR 2021:
“A Definitive Feasibility Study (DFS) is underway at the Kachi Project with Hatch providing engineering, which is aimed for completion in Q1 next year, together with other related studies.”
From past experience Moz, with respect to big talkin Steve’s actual delivery dates, always assume the end of a period stated, and always slip it at least one Qtr.
For example “H2 2021” (re demo plant on-site), read DEC 2021, then slip it one Qtr (MAR 2022).
Similarly, “Q1 next year” (re DFS), read MAR 2022, then slip it one Qtr (JUNE 2022).
This process is reliably accurate and helps to avoid disappointment.
- Forums
- ASX - By Stock
- LKE
- 2021 and beyond
2021 and beyond, page-1926
-
- There are more pages in this discussion • 7,950 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
0.001(3.03%) |
Mkt cap ! $56.72M |
Open | High | Low | Value | Volume |
3.3¢ | 3.5¢ | 3.3¢ | $53.27K | 1.571M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 2082072 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 1455567 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
25 | 2082072 | 0.033 |
13 | 623060 | 0.032 |
16 | 2089023 | 0.031 |
35 | 2585455 | 0.030 |
8 | 854310 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 1455567 | 5 |
0.035 | 1097322 | 7 |
0.036 | 1216597 | 10 |
0.037 | 646500 | 5 |
0.038 | 771529 | 7 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |