FBR 8.00% 2.7¢ fbr ltd

Let’s ignore the clowns, page-113

  1. 5,861 Posts.
    lightbulb Created with Sketch. 1998
    You know very well this industry is all about the bottom line . I’d have to disagree with you with regards to speed of build.

    A: in 1-2 day structure is built . Not 3 weeks .
    B : There is no down time due to , mistakes in material delivery , waiting for trades , inclement weather , site clean , there is so many point to this I will not go into all of them .
    C: roof trusses can be delivered off plan the very next day .
    D: there is no waiting for wall chasers to chase walls for services. The services are much quicker and easier to fit .
    E : kitchens can be Pre made off plan , no need to go to site to measure.
    F: door frames are fitted as brickwork reaches required height same day .
    G: the structure could be water tight in a week ready for other trades to dress up .

    Tell me how this isn’t speeding up build time ?
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
0.002(8.00%)
Mkt cap ! $119.9M
Open High Low Value Volume
2.6¢ 2.8¢ 2.5¢ $210.5K 7.901M

Buyers (Bids)

No. Vol. Price($)
7 1225137 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 156732 1
View Market Depth
Last trade - 16.10pm 03/07/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.