Lets look at the facts,
Abra’s box-cut is about 190 m long (north-south) to a depth of 25 m and an average width of about 45 m (east-west). The southern wall that is the base of the box-cut is the location of the future main portal for the underground mine decline.
The First stage of a Box Cut is completed by an above ground mining company we used Mine Site Construction Services.
See further information below.Abra Base Metals Project – Mine Development Works
Mine Site Construction Services was contracted to construct the Box Cut for the underground portal and carry out other preliminary groundwork not to cut the portal, the Under Ground Mining Company is contracted to do this work.Abra Base Metals Project
PROJECT OVERVIEW
Abra Base Metals Project is a globally significant lead-silver project located in the Gascoyne region of Western Australia approximately 350km North West of Meekatharra.
Mine Site Construction Services was contracted to construct the Boxcut for the underground portal and carry out other preliminary groundwork enabling the commencement of underground mining and construction of processing infrastructure.
CLIENT
Galena Mining Limited
RESOURCE
Base Metals
LOCATION
Gascoyne region – WA
CONTRACT PERIOD
January 2020 – April 2020
Personnel Employed
20+
Man hours
7000hours
Top Soil
2000bcm
Clearing
17ha
Mined Material
75000bcm
Drill Depth
9092m
Blast holes fired
2200holes
Services Provided
- Mob and Demob to Remote LocationConstruction of Project Mobile Workshop and Temporary Administration Facilities Clearing of Boxcut, Waste dump, Magazine, ROM and haul/access roadsRemoval of Topsoil to designated stockpile locations
Construction of Haul Roads and Ancillary Roads
Drilling & blasting the Boxcut, Event Pond, Turkeys Nest and Industrial Tip
Load and haul to excavate the Boxcut, Event Pond Turkeys Nest and Industrial Tip
PROJECT GALLERY
The Portal work will be completed by the Under Ground Mining company, this will involve further excavation at the site as they will be responsible for all safety aspects of the decline.
We all have to remember this is a work in progress and every company has a job to play in the final construction and safety of the mine. When the Portal goes in the Box Cut will only then be finished, building a mine has many stages and Abra is only starting.
Hope this clears up all the misunderstandings we have a Box Cut and it is still a work in progress.
all the best
FireflyOne
The writer's opinions are his own and do not constitute financial advice in any ways.Nothing here constitutes an investment recommendation nor should anything written here or published by myself be relied upon for any investment activities.I strongly recommend that you perform your own independent research and/or speak with a qualified investment professional before making any financial decisions.
- Forums
- ASX - By Stock
- G1A
- Ann: Quarterly Activities and Cashflow Reports
Ann: Quarterly Activities and Cashflow Reports, page-12
-
-
- There are more pages in this discussion • 85 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable