"Multi-stage treatments can be used to selectively treat zones of interest with frac treatments being designed for each group of sands being stimulated. The need for zonal isolation and the additional time needed for sequential pumping of multiple treatments can add considerable cost. However, this additional cost is usually quickly recovered by the incremental gas production. Multi-zone completions with limited entry, mechanical bridge plugs or packer isolation devices are routine."
http://media.godashboard.com/gti/4ReportsPubs/4_7GasTips/Fall04/UnconventionalGasReserveOpportunitiesAndTechNeeds.pdf
JB
- Forums
- ASX - By Stock
- TSV
- routine process - isolation bridge plug
routine process - isolation bridge plug
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TSV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online