Links and facts ?
Nope. You've posted nothing but baseless bs.
You made the claim about the cost of nuclear power vs renewable power.
" Cost to build the latest Nuclear power station - $25 million
Cost to build the latest renewable energy project - wind, solar, whatever - $325 billion "
And now you're bragging about the taxpayer subsidizing fossil fuel ?
You really aren't that bright , aren't you ?
- Forums
- Science & Medicine
- Victorian Renewable Stupidity Spreading
Victorian Renewable Stupidity Spreading, page-23
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
MTL
Mantle Minerals' Nick Poll talks to HotCopper on finding gold grades up to 3.57g/t at Mt Berghaus