I reckon the paragraph below foreshadows where EuGeni could be manufactured in AU and US in the future:
"Operon themselves are investing in new plant that will more thantriple their capacity and will be available during 2023. Locally, Ellume have invested very heavily inlateral flow assembly capability in Brisbane, which is now operational, and are currently duplicatingthat capability in Maryland, U.S.A"
And you know what the best thing is? After all the good things AnteoBind has helped Ellume achieved, I think it is almost time that we ask for a favour in return. We have something that they NEED, they have something that we WANT.
Lastly, "lateral flow assembly capability", does that mean we can manufacture 20 million strips at Operon, send it to Ellume in Brisbane for them to "assemble" the test? Therefore bringing the current total capacity to 28 million?
- Forums
- ASX - By Stock
- ADO
- Ann: Update - AnteoTech signs manufacturing contract with Operon
Ann: Update - AnteoTech signs manufacturing contract with Operon, page-65
-
- There are more pages in this discussion • 117 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add ADO (ASX) to my watchlist
|
|||||
Last
2.0¢ |
Change
0.001(5.26%) |
Mkt cap ! $49.37M |
Open | High | Low | Value | Volume |
2.0¢ | 2.0¢ | 1.9¢ | $15.05K | 758.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2299968 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 209963 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2149968 | 0.019 |
6 | 1295000 | 0.018 |
4 | 691470 | 0.017 |
5 | 560050 | 0.016 |
4 | 806669 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 209963 | 3 |
0.021 | 379634 | 5 |
0.022 | 505000 | 2 |
0.023 | 563112 | 2 |
0.024 | 370737 | 4 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
ADO (ASX) Chart |