FBR 0.00% 2.4¢ fbr ltd

Reason for FBR following still, page-120

  1. 5,861 Posts.
    lightbulb Created with Sketch. 1998
    Yes those quotes by Mike are pretty ballsy there is no beating around the bush here .I believe they are working bloody hard to make it happen , I’ve always said it they will use Perth as the pilot program to the world , success here will open the flood gates to the world . As I said Builders here are extremely keen , prototypes have done their job , full working models are in assembly phase as we speak . If the new 2 HX’s were working 5-6 days 50% up on speed 1 structure per day they would certainly solve the brickies shortage imo . All this Bull about not being viable, how can anyone know this without producing numbers ! There are Builders on here that can’t even produce a total spread sheet of costs from first brick laid to last brick laid , and all we have to go on is their word “I’m successful I talk to engineers it’ll never work” blah blah then the other tag teams come on vulgar name calling Noobs etc etc blah blah . I just skip through that Sh!t now ! just a waste of time . There is nothing these non holders can say that’ll sway my mind they’re on here day and night and don’t hold ! LOL expose them back them into a corner and this is what you get from these so called experts ! Disgusting vulgar name calling how can anyone take them seriously? Let’s totally ignore these no holders they’re baiting us and get back to some meaningful intelligent conversations, I’m not even worried atm about the SP as I have no doubt this is one of the greatest inventions this century ! don’t forget this is just one application for their DST if In doubt think about it have they produced what they said they will ? Disregard blown out time lines , and all the other bits in between ,sh!t management decisions etc that we may or may not agree on , let’s look at what they have produced to date .
    A) 6 yearsago there was an excavator with a boom
    B) the blue prints for HX were drawn .
    C) the animation drawing was finally bought to life.
    D) strenuous testing , trial and error, engineers feats overcome.
    E) first structures built and codes passed , more strenuous testing .
    F) first Display and Commercial site structures built, assessing how to improve on this , learned from it and engineered better Model as per announcement.
    G) Covid had huge impact on the world let alone the FBR team.
    H) the Display was completed to a high standard passed all Australian standards and sold for a higher price than most homes in that area without any problems whatsoever. The Commercial site was also built to a very high stand and tenanted on handover . Occupancy Certification issued .
    I) In that address to shareholders it tells me plenty where they are heading , I have no reason to doubt them as from what they have promised so far they have delivered as far as having produced HX and passing all Australian standards , timelines will blow out , investors will be annoyed, silence causes panic and so do non holders posting fear day and night . Get ready for the attack on my essay lol, noob, blah blah , frankly I don’t give a rats arse about these “thread viruses”as I have faith they will make it happen . Not financial advice just my thought on the information at hand produced by this company and some very good poster on HC who have done some solid research . Ignore the viruses and let’s get back to some meaningful discussions. Here are some expert opinion from our expert ! Vulgar they have no credibility whatsoever in my book ! IGNORE . Respect and Patience.
    DED11B87-0392-477C-81E1-33406F4E5570.jpeg 9A12E1B4-BDD0-4F00-8403-F998BDFD68E7.jpeg 9E3FC517-41E2-4E4C-9495-691B53B073D6.jpeg C0C88598-E887-4FC8-99CE-B0B89E7E1B5C.jpeg C0C88598-E887-4FC8-99CE-B0B89E7E1B5C.jpeg
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.000(0.00%)
Mkt cap ! $106.5M
Open High Low Value Volume
2.3¢ 2.4¢ 2.3¢ $115.8K 4.835M

Buyers (Bids)

No. Vol. Price($)
27 6564428 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 565145 2
View Market Depth
Last trade - 15.49pm 24/06/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.