CTP 4.00% 4.8¢ central petroleum limited

johnstone misinformation, page-6

  1. 1,396 Posts.
    Sorry missed your last line there Grangeh.
    It would be nice to build our own line but how much would a 400km oil pipeline from Johnstone to Alice Springs cost? I shudder to think. I might ring the company to see if I can milk some information out of them:)

    I found this on existing Mereenie and Palm Valley pipelines from...http://www.nt.gov.au/d/Minerals_Energy/index.cfm?Header=Pipelines#2


    "Licence 1 - Palm Valley Pipeline
    Completed in 1983. Supplies natural gas to Alice Springs area. Length -140km long; Internal diameter - 8 inch; Maximum operating pressure - 7000kPa. [top]

    Licence 2 - Mereenie Oil Pipeline
    Completed in 1985. Carries crude oil from the Mereenie oil and gas field to Brewer Estate south of Alice Springs for transhipment to South Australia. Length - 269km; Internal diameter - 8 inch; Maximum operating pressure - 9000 kPa.

    Licence 4 - Amadeus Basin to Darwin Pipeline
    Completed in 1986. Supplies natural gas to Darwin, Katherine, Tennant Creek and other centers either directly or through connecting pipelines. Length - 1660km; Internal diameter - mainly 12 and 14 inch; Maximum operating pressure - 9,650kPa (with the exception of the 116km Mereenie lateral which is designed for 10,150kPa)."
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.002(4.00%)
Mkt cap ! $35.52M
Open High Low Value Volume
4.8¢ 5.0¢ 4.6¢ $22.4K 468.3K

Buyers (Bids)

No. Vol. Price($)
2 364569 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 10000 1
View Market Depth
Last trade - 15.32pm 20/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.