Ok I'll stick my neck out again.
Re production rate. I'm pretty sure they have said they will aim for 100,000 oz a year. If you work it back from the grade that is actaully 2.5 mta.
(it is also why I was using a higher grade, and lower tonnes based on Measured and Indicated, rather than inferred etc. But that's another issue)
50m capex. Yes. I have spoken with Gekko systems, re plant, set up etc etc, and that is a pretty good ball park guide. Of course it is an estimate. Others may have better
Do you think 50 m is too high or too low?
Great, use $495 au for oz cost
I know of no other royalty? Why can't they guarantee that? The only snag is the case over one of the concessions, but that is very very unlikely to be a negative outcome and minimal if it is I expect.
Cheers
amayapampa npv anyone?, page-22
Currently unlisted. Proposed listing date: WITHDRAWN
Add to My Watchlist
What is My Watchlist?