it may have been a lot more than 2 billion.
At the time of the reporting of the cost blowouts for the Ravensthorpe project figures as high as 3.8 billion and as low as 2.2 billion had been reported in WA newspapers.
The origional budget was 1.8 billion and and 18 months construction time. Construction began in early 2005.
Construction continued officially until the grand opening in 2008 and construction work was still being carried out right up until the closing of the site.
So 2 billion may be a very modest estimate.
- Forums
- ASX - By Stock
- BHP
- ravensthorpe nickel
ravensthorpe nickel, page-4
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BHP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$42.96 |
Change
0.570(1.34%) |
Mkt cap ! $217.9B |
Open | High | Low | Value | Volume |
$42.74 | $43.16 | $42.65 | $205.9M | 4.798M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 13803 | $42.95 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$42.97 | 35250 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 13803 | 42.950 |
2 | 4155 | 42.940 |
1 | 6523 | 42.920 |
2 | 37158 | 42.910 |
3 | 27461 | 42.890 |
Price($) | Vol. | No. |
---|---|---|
42.970 | 35250 | 1 |
43.000 | 2700 | 2 |
43.050 | 1750 | 3 |
43.100 | 120 | 2 |
43.110 | 221 | 1 |
Last trade - 16.10pm 28/10/2024 (20 minute delay) ? |
Featured News
BHP (ASX) Chart |