SLZ 0.00% 0.8¢ sultan resources ltd

Drill status - Big Hill

  1. 120 Posts.
    lightbulb Created with Sketch. 46
    Drill rig collared the 1st hole on 18th May. Planned 4 week program for the three by 400 metre holes means they should have completed two holes and early stages of the third. With a week or so to go.. Tight hole status? Anyone heard anything?
 
watchlist Created with Sketch. Add SLZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.