Sure SF. The complexity I am referring to is sequencing. I believe the
pilot plant has not been built yet to verify the Calix claims, so how should
Posco go about timing and ordering equipment for their plant. I'm not an
engineer but don't they have to work out scaling up the pilot plant equipment.
How much lead time is required for manufacturing and delivering this equipment.
Again, not an engineer, but their must be complex engineering logistics to figure out
that are contributing to how long this is taking to work out.
- Forums
- ASX - By Stock
- PLS
- Good News & Bad News
Good News & Bad News, page-1482
-
-
- There are more pages in this discussion • 44,814 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.90 |
Change
0.020(0.69%) |
Mkt cap ! $8.732B |
Open | High | Low | Value | Volume |
$2.86 | $2.94 | $2.80 | $102.1M | 35.55M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 314863 | $2.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.91 | 20820 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 11001 | 2.860 |
3 | 63402 | 2.840 |
2 | 10003 | 2.830 |
2 | 11060 | 2.820 |
4 | 53088 | 2.810 |
Price($) | Vol. | No. |
---|---|---|
2.910 | 20000 | 1 |
2.920 | 94952 | 9 |
2.930 | 106414 | 14 |
2.940 | 173277 | 18 |
2.950 | 265756 | 21 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online