why dii ok you say a lot of manual labour was required to mage the residential build up to code. What manual labour are you referring to that is additional to what a conventionally built wall would require?
Remember the hx was going to replace the labour component of actually laying the bricks. It was never intended to replace all processes involved In building the wall ready fur a client.
not investment advice. Dyor, etc etc
- Forums
- ASX - By Stock
- FBR
- Ann: Hadrian X builds childcare centre at Amberton Beach
Ann: Hadrian X builds childcare centre at Amberton Beach, page-32
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.8M |
Open | High | Low | Value | Volume |
4.1¢ | 4.3¢ | 4.1¢ | $253.4K | 6.024M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 1225791 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 513275 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 968603 | 0.041 |
14 | 2009225 | 0.040 |
11 | 541571 | 0.039 |
3 | 731578 | 0.038 |
6 | 842347 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 500000 | 1 |
0.043 | 496357 | 1 |
0.044 | 1341567 | 4 |
0.045 | 783301 | 6 |
0.046 | 917410 | 3 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |