ELT 2.22% 9.2¢ elementos limited

Ann: Oropesa DFS Commencement, page-22

  1. 270 Posts.
    lightbulb Created with Sketch. 16
    Only talking with the benefit of 40 years experience as a mining engineer and the knowledge that I am frequently wrong. there is a right way to go about developing a mineral project and a lot of wrong ways. There are repeating warning signs about projects that go off the rails. This one has a couple. The first is skipping from pea to dfs. The second is quoting all sorts of financial metrics on a pea basis. The latter is allowed on tsx but generally a no no onnasx where pea is not recognised. Have a read of info 214 and have a think.
    . https://asic.gov.au/about-asic/news-centre/find-a-media-release/2016-releases/16-111mr-asic-releases-information-sheet-214-mining-and-resources-forward-looking-statements/


    grade is one thing but costs and level of confidence in estimates of grade and costs important. The confidence in both is reflected by the category or Resource/reserves.

    It may be one of the highest tin grades around but its a primary cassiterite so it needs to be crushed and ground before processing. That makes it not directly comparable on a grade basis to an alluvial tin deposit where power intensive/expensive grinding circuits are not needed. It needs to be compared on a $/tonne of ingot basis.


    that metric and the confidence in it it’s an outcome of the level of engineering underlying the estimate
 
watchlist Created with Sketch. Add ELT (ASX) to my watchlist
(20min delay)
Last
9.2¢
Change
0.002(2.22%)
Mkt cap ! $18.86M
Open High Low Value Volume
9.2¢ 9.2¢ 9.2¢ $2.3K 25K

Buyers (Bids)

No. Vol. Price($)
2 24721 9.0¢
 

Sellers (Offers)

Price($) Vol. No.
9.4¢ 12350 1
View Market Depth
Last trade - 11.16am 03/09/2024 (20 minute delay) ?
ELT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.