TVN 4.17% 5.0¢ tivan limited

Ann: TNG Progresses Darwin EIS, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 12,125 Posts.
    lightbulb Created with Sketch. 5022
    The Company and APM have completed assessment of the specific scopes of work required to address those
    mattersraised in the Direction that, following the meetings held between the partiesstill remain outstanding, which
    will include the following additional/updated technical reports:
    • Revised air quality assessment;
    • Updated noise modelling;
    • Visual impact assessment;
    • Updated traffic impact assessment;
    • Greenhouse gas management plan;
    • Biodiversity offset plan;
    • Waste management plan; and
    • Detailed assessment of alternative sites.
    TNG and APM have commenced engagement with technical consultants and collection of further engineering and
    design data for the preparation of additional/updated technical reports, which will lead to completion of the final
    report for submission. The Company expects that the completion timeframe will be within the 12 months
    “Submission Period” provided by the NT EPA in the Direction, with the additional information being prepared in
    parallel with the engineering and project financing activities for the development of the Mount Peake Project


    Great around 12 months at least. Time for me to leave, good luck everyone.
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.