beerinfridge,
I was only using the long term isolated test.
Because it is the best info we have.
ie - 1mmcfd from zone 6
3.5 times from zone 7 and zone 8
(alos pretty good info)
That means 3.5mmcfd from zones 7/8
plus the 1mmcfd from zone 6.
So 4.5mmcfd from 6,7 and 8
"zones 3-6 will add a little." - this is me being conservative.
BUT - 4.5mmcfd is a great result.
I will be throwing the kitchen sink into this thing if that is confirmed. Easy 12 cent value.
Being optimistic - which I prefer not to do
If the cement squeeze is successful and we get 4.5mmcfd again from the lower 6 zones - THEN PLUS - 3.5mmcfd from 7/8.
TOTAL - 8mmcfd
wholly crap - I'll put grange hermitage in the fridge.
This was a good ann
Add to My Watchlist
What is My Watchlist?