    I have been through your numbers. Please check my ones below, which are so conservative, that I have to stop at 5pm to have a cup of tea.

    You stated above $2.34/dmtu mining cost, however I was of the idea that E25 cost is actually $4.15/dmtu (or $132/tn 33% ore) for Stage 1.

    I am using 65% recovery (Manga X assumption) and Giyani opex (USD 583/tn of HPMSM produced). So worst case scenario, actually rather "end of the world" case scenario to assess bottom line. I know you are assuming ~$100/tn of ROM processed above, so the one I use is ~2 times higher. Giyani flowsheet claims 90% recovery. Their CAPEX is ~USD$150M. Plus they have high cost for electricity and boiler. I guess we can tap into the gas line for the Drier, so cheaper opex and capex.

    In summary, this is a pre-tax NPV ~ US$ 2B. (bottom line). Going to to US$ 2.5B plus (if I halve the assumed below opex (in line with reality) and use 80% recovery), i.e. either 1 year payback or yet another 6 months payback period project..... Someone correct me if I am wrong please.....???? rolleyes.png

    Summary of Key Life of Project ParametersBottom Line

    Realistic






    RoM Mined (kt/year)300

    250
    Waste Mined (kt/year)1,07128%
    89328%
    RoM Processed (kt/year)300

    250
    Mn Content(kt/year)9933%
    8333%
    Mn Recovered(kt/year)6465%
    6680%
    HPMSM Tonnes Produced(kt/year)20132%
    20632%












    Revenue (USD/t HPMSM)1,500

    1,500
    Operating Costs (USD/t HPMSM)583

    292
    Operating Profit (USD/t HPMSM)917

    1,209






    Operating Profit (USD/year)184,402,969

    249,253,125


    But wait, this is modular.... so effectively we can add extra $2B projects whenever the markets needs more HPMSM (every 2 or 3 years).....as there is plenty of ore.....


    DYOR!!




    Last edited by PirataCzornomaz: 16/07/21
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
0.010(4.88%)
Mkt cap ! $47.28M
Open High Low Value Volume
21.0¢ 21.5¢ 20.0¢ $36.55K 181.8K

Buyers (Bids)

No. Vol. Price($)
1 10623 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 8505 2
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.