ESG 0.00% 86.5¢ eastern star gas limited

Ann: Bimonthly Drilling Report , page-20

  1. 984 Posts.
    lightbulb Created with Sketch. 23
    Bibblewindi 27 is the first vertical production well as part of two lateral “shield” wells to be
    drilled, one either side of the current Bibblewindi Lateral Pilot. The strong performance of this
    pilot to date has shown that it is drawing from a very large reservoir. To better represent the
    development performance of this pilot and to reduce the water influx from the larger than
    anticipated reservoir, the two shield wells will be drilled to allow the existing pilot to more
    effectively draw down the reservoir pressure within the coals in a timely manner. Each is designed
    as a single lateral drilled for approximately 1000m of in seam before intersecting a single vertical
    producer.

    The technical know how of this company is mind blowing in what they are achieving, I'm only seeing good news in this report.
 
watchlist Created with Sketch. Add ESG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.