POS 0.00% 0.4¢ poseidon nickel limited

Ann: Windarra Gold Tailings DFS Highlights Robust Project, page-4

  1. 1,054 Posts.
    lightbulb Created with Sketch. 596
    Key Recommendation of DFS
    • Consider engaging a Joint Venture (JV) partner to implement the Project who has the demonstrated
    engineering design and construction expertise but also the capability to manage the project during the
    operations phase. A JV partnership (equity based) project implementation model would minimise
    construction contractor mark-ups and incentivise project delivery performance across construction,
    schedule, capital cost, operating cost, and also assist to align the key processing KPIs (such as
    metallurgical recovery) during operations.

    The Company will commence a process to seek opportunities to monetise the Project, in particular divestment
    or JV options presented to Poseidon.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $14.85M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $308 68.78K

Buyers (Bids)

No. Vol. Price($)
94 67484980 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 16076848 27
View Market Depth
Last trade - 16.10pm 10/07/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.