Can you offer an opinion on TSV connection(director)and close location (30kms)to AVA power project.Although largest % of power generation will be from coal, gas will also be required.Lash
LU7 The Breakdown: Lithium Universe talks financial modelling and lithium pricing in strong preliminary feasibility study for Bécancour