I think RJN is referring to the water level in Observation Hill Dam (OHD) on google earth.
The image date was taken on the 20/7/20 and it looks very dry, as could be expected at that time of year.
From an engineering perspective we are to construct an access road to OHD and a pipeline to draw what I understand is a primary feed to stock our own man made dams on site, I would expect this to be begin this year and might constitute on its own as " The start of construction ".
However RJN refers to the EIS so I'm a little baffled myself as to his comment.
Not expecting a reply, but any further comment Rummy ?
- Forums
- ASX - By Stock
- CXO
- Ann: Stage 1 DFS and Updated Ore Reserves
Ann: Stage 1 DFS and Updated Ore Reserves, page-92
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
-0.005(4.17%) |
Mkt cap ! $251.8M |
Open | High | Low | Value | Volume |
12.5¢ | 12.5¢ | 11.5¢ | $370.0K | 3.077M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
81 | 5391587 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 1533874 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
81 | 5110929 | 0.115 |
120 | 7070960 | 0.110 |
76 | 4542069 | 0.105 |
152 | 10522041 | 0.100 |
10 | 375348 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 1411044 | 20 |
0.125 | 4335822 | 39 |
0.130 | 4904818 | 49 |
0.135 | 4889597 | 44 |
0.140 | 2933363 | 36 |
Last trade - 10.53am 14/10/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |