This has been my thoughts for a long time now with no updates keeping the SP low, even before the Riley delay.
I always pondered a chalice take over but my theory was quashed when the Thor results were released and continued drilling required.
My theory now is not to stir the hornets nest with the BBF, quietly have enough ore in Burnie for a ship load then bam commissioning, trucking, ship ordered and sailed.
Can you imagine having half a boat load of ore in Burnie and the rest sitting at site on the rom pad ready for trucking with the ship docked and the BBF protest a road block and delay the ship ? (catastrophic)
I believe the aim of the game is say silent crush, truck, load, announce, then ship.
- Forums
- ASX - By Stock
- CRI
- Riley Iron Ore Mine - Progress, Photos and Calculations
Riley Iron Ore Mine - Progress, Photos and Calculations, page-439
-
- There are more pages in this discussion • 831 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $32.04M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $36.84K | 3.065M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 829096 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1791700 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 829096 | 0.012 |
29 | 9528781 | 0.011 |
14 | 5079595 | 0.010 |
6 | 3690635 | 0.009 |
4 | 3163750 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 1791700 | 6 |
0.014 | 2740000 | 5 |
0.015 | 3081186 | 5 |
0.016 | 4080000 | 4 |
0.017 | 1396699 | 7 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
CRI (ASX) Chart |