Folks,
The VPE presentation (slide 21) state initial production from the snatcher field is slated for October 09 with the aim of lifting 400 bopd. So we can assume 200 bopd each from S1 & S2 ?
Cummulative production figures for christmas look very good !
Cheers,
Add to My Watchlist
What is My Watchlist?