POD podium minerals limited

Ann: Parks Reef Deeps, page-13

  1. 42 Posts.
    lightbulb Created with Sketch. 3
    Is there any updates on this by now


    Deep Diamond Drilling to test Parks Reef at >500m below surface.
    During the quarter, the company advised that it had recently been notified of its successful application to the State
    Government of Western Australia for co-funding of direct drilling costs to drill two 750m deep diamond drill holes designed
    to test Parks Reef at approximately 520m below surface.
    This is more than twice the depth of any previous drilling conducted at Parks Reef and follows recent successful drilling
    programmes which have identified high grade zones hosting not only platinum and palladium but recently rhodium and
    iridium.
    The co-funding forms part of Round 23 of the EIS and $150k has been awarded to the Company which represents 50% of
    the direct drilling costs. An additional third deep hole has also been planned which is outside of the EIS programme.
    The objective of the Parks Reef Deeps drilling programme is threefold.
    • To test for continuity of grade and thickness of the reef at approximately 520m below surface for an
    enhanced interpretation of the intrusive complex. If the reef is intersected at these depths, then it is
    considered that precious and base metal grades, mineralogy and metal ratios of the reef will provide
    valuable vectors toward zones hosting higher grade and/or thickness of PGM mineralization.
    • To drill for previously untested, high grade, reef style PGM+/- Cr (Ti) mineralization in the hanging wall
    mafic stratigraphy, which occurs in the Stillwater (J-M reef) and Bushveld (Merensky and UG2 reefs
    complexes in Montana and South Africa respectively. The proposed holes will test approximately 450m
    of this potentially fertile mafic stratigraphy.
    • To enhance the understanding the magmatic stratigraphy of the lower section of the mafic zone.
    Due to conditions attached to the funding programme, it is anticipated that drilling will commence in July and is expected to
    take approximately 1 month to complete.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.0¢
Change
0.000(0.00%)
Mkt cap ! $31.79M
Open High Low Value Volume
4.0¢ 4.0¢ 3.9¢ $8.175K 207.4K

Buyers (Bids)

No. Vol. Price($)
3 195761 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 98837 1
View Market Depth
Last trade - 12.40pm 07/08/2025 (20 minute delay) ?
POD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.