The top is mapped at around 3250m measured depth & is around 50-60m odd thick, so wont b until they get to that depth (post setting the 9" casing etc etc). The net to gross, porosity, perm is known from the offset wells. The attic is at Crestal due to displacement from local faulting as seen & mapped from the Seismic's.
They'll know in realtime what they r drilling thro' from the MWD/LWD tool assembly & ditch gas thro' the GasChrom. However, comprehensive WL Logging & fluid sampling etc is done on reaching TD. So around 5-7 days for running logs etc. The well is in a known province not far from their offset well Buffalo-5, so Pressure & Fluid data acquisition holds the key. Oil quality was very light around 53 API. Will monitor the V107 rig when there's any movement in Oct after the 2 Skua remedial wells. Jadestone should release some info in their Sept qtrly.
For now, it's probably worthwhile for all to catch up on Buffalo redevelopment Full RISC reporton Advance's website.
- Forums
- ASX - By Stock
- CVN
- Ann: Buffalo-10 Drilling Update
Ann: Buffalo-10 Drilling Update, page-56
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.010(6.45%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
15.5¢ | 16.5¢ | 15.5¢ | $201.4K | 1.258M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 888369 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 1476114 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 888369 | 0.155 |
19 | 1245634 | 0.150 |
19 | 860361 | 0.145 |
11 | 597422 | 0.140 |
2 | 437000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 1476114 | 9 |
0.170 | 690959 | 13 |
0.175 | 944490 | 9 |
0.180 | 597382 | 9 |
0.185 | 92057 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |