out of interest, I did a short term graph of prod'n from Orbost.
just on these processing rates, COE is averaging 40tj/d, with the absorbers being cleaned every 3-4 days.
it looks like it is 5 days from prodn at 45tj/d, then down into 30's, then back to 45tj/d
so from 45tj/d and start of cleaning - then next day of 45tj/d prod'n, is about 5 days. so in between is ramping down into 30's then ramping back up to 45tj/d level.
The avergage prod'n from 1 July to 16 Aug is 40.16653 tj/d.
- Forums
- ASX - By Stock
- COE
- Ann: FY21 full-year results details
Ann: FY21 full-year results details, page-5
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $501.6M |
Open | High | Low | Value | Volume |
18.5¢ | 19.0¢ | 18.5¢ | $84.89K | 451.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 123639 | 18.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 274260 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 123639 | 0.185 |
6 | 534834 | 0.180 |
7 | 686992 | 0.175 |
6 | 555975 | 0.170 |
5 | 426133 | 0.165 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 274260 | 8 |
0.195 | 653532 | 7 |
0.200 | 966591 | 11 |
0.205 | 397895 | 8 |
0.210 | 190654 | 6 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |