OPEX and AISC accounting treatments are different. Here is the same BFS. OPEX around 230 USD, after sustaining costs are included, AISC measurement of operating costs is US263.
Sustaining costs were classified with CAPEX (incl sustaining costs). Note sustaining costs can usually be depreciated (depending on what it is) so for the DCF model the banks where using, the cashflow from depreciation needed to be taken into account.
- Forums
- ASX - By Stock
- KLL
- Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case
Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case, page-167
-
- There are more pages in this discussion • 182 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
Add KLL (ASX) to my watchlist
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable