Someone on the result call asked a question about how much - in ballpark terms - the logistical issues being experienced impacted the GP Margin in the second-half.
The answer came back as "around 100bp" but the subsequent elaboration in the answer suggested it could easily have been more.
Still, even if we assume it was 100%, and we assume that at some stage the Covid-induced logistics bottlenecks will become a thing of the past, then adjusting for that 100bp of foregone margin, would result in a $450k uplift, a not-immaterial number in the context of $4.25m JH21 PBT (ex- Covid subsidy payments).
So, one could quite easily mount a defensible argument that the second-half result is understated by between 12% and 15%.
.
- Forums
- ASX - By Stock
- SDI
- Ann: Media Release 30 June 2021 Results
Ann: Media Release 30 June 2021 Results, page-8
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SDI (ASX) to my watchlist
(20min delay)
|
|||||
Last
96.5¢ |
Change
0.035(3.76%) |
Mkt cap ! $114.7M |
Open | High | Low | Value | Volume |
95.5¢ | 96.5¢ | 95.5¢ | $1.079K | 1.118K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 26593 | 95.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
96.5¢ | 687 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12199 | 0.930 |
1 | 116 | 0.925 |
2 | 13000 | 0.920 |
1 | 6146 | 0.915 |
1 | 111 | 0.895 |
Price($) | Vol. | No. |
---|---|---|
0.970 | 6203 | 1 |
0.980 | 6000 | 1 |
0.990 | 6999 | 3 |
1.000 | 10344 | 1 |
1.010 | 108150 | 2 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
SDI (ASX) Chart |