very eloquent.
there is a difference between mending a broken model, and improving an already efficient system. Pumping and harvesting
the salts is clearly time reliant. So I’m glad KLL began this process earlier than it’s counterparts, learning from the process firsthand. I don’t doubt the upgrade is necessary, but there is zero trust in any sort of communication stream to SHs. Having to call the company for info, what a strategy.
”KLL anticipates the German-engineered Beyondie SOP plant will achieve better plant availability and utilisation rates (vs BFS assumptions), permitting increased throughput.” March 2021
This event probably should have been anticipated. I am still excited by this new industry and will continued to hold. However, after holdIng for a couple of years have re-evaluated my exit.
BAW
- Forums
- ASX - By Stock
- KLL
- Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case
Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case, page-249
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online