WKT 0.00% 10.0¢ walkabout resources ltd

Ann: Lindi Jumbo Project Update, page-94

  1. 16,180 Posts.
    lightbulb Created with Sketch. 6904
    Hi Mercury,

    you assumptions are all based on the success of WKT selective mining of the same host material.

    WKT is likely to have issues with controlling the feed grade to the production facility where the average TGC could be similar to WKT 2018 updated JORC 10.8% TGC.


    upload_2021-8-24_22-45-26.png

    https://www.asx.com.au/asxpdf/20181219/pdf/441c1cnppvnt6m.pdf

    Based on the average TGC from the 2018 JORC's and Lindi's small production facility, WKT annual production could be significantly lower than the forecast 40ktpa, which will increase the OPEX, WKT may not even achieve the % of large flake graphite from its Fresh Mineralisation.

    Before we see how this all unfolds, WKT needs to secure the EPC contract from Jinpeng. If you read Croc's post, he advises Andrew response about the delay on signing the EPC contract "His answer was they are looking at even further possible savings from different contractors enquiries to increase savings." It appears there have been further cost blow outs where WKT is needing to look for additional savings. IMO this is very obvious when WKT has already re-tendered the logistics, camp and power contracts.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.000(0.00%)
Mkt cap ! $67.12M
Open High Low Value Volume
10.0¢ 10.0¢ 10.0¢ $4.33K 43.3K

Buyers (Bids)

No. Vol. Price($)
1 15000 9.8¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 227817 3
View Market Depth
Last trade - 13.25pm 15/08/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.