POS 33.3% 0.4¢ poseidon nickel limited

Black Swan Production Restart, page-62

  1. 5,029 Posts.
    lightbulb Created with Sketch. 2247
    Atom,

    Judging from the colouring/lighting/shadows that aerial pic looks like the one taken on 21/04/21

    More to the point, however, are you able to provide the source link for your image showing the proposed power plant for corroboration?

    It's my understanding that the Black Swan project is already connected to the mains grid, so I'm interested to know the broader context of where that proposed power plant came from.

    2014:
    Actual components/features of the BS processing plant as at July, 2014:
    https://hotcopper.com.au/data/attachments/3510/3510278-05d2d9655823dd2786439afa60814f35.jpg
    Source: "Mt Windarra Trucking to Black Swan Engineering Study (Pre-Feasibility)" announcement (13/08/14, p.3).

    2018:
    Mid-2018 commentary about on-site BS power facilities:
    https://hotcopper.com.au/data/attachments/3510/3510292-b58c776968f96a693848c18161df9e47.jpg
    Source: "Black Swan & Silver Swan Feasibility Study Supports Restart" announcement (18/07/18, p.5).

    And

    2021:
    GR Engineering CAD drawing dated June, 2021:
    https://hotcopper.com.au/data/attachments/3510/3510265-b1b75accf3853d7a58071258deac193d.jpg
    Source: "Scoping Study Completed for Black Swan Processing Options" announcement (27/07/21, p.3).




 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(33.3%)
Mkt cap ! $14.85M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $9.456K 2.663M

Buyers (Bids)

No. Vol. Price($)
83 50307585 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 7456574 23
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.