FBR 0.00% 4.3¢ fbr ltd

Ann: Preliminary Final Report, page-7

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 2,403 Posts.
    lightbulb Created with Sketch. 267
    So let me get this straight:

    $3,000,000 in "performance" bonuses over 2021 financial year to the directors.

    Net total loss on company accounts is around $9,000,000.

    The 3 averaging medium, medium-large sized builds gave us only $17,000

    Which means we need about 500 of such 3 builds a year to break even, which means in total we need to construct 1500 total commercial and residential buildings to break even, assuming the directors don't take a disproportionate amount of the revenue through "performance" rights.

    If we can pump out one basic build a week with one machine, the entire year, that gives us about 50 builds a year on one machine, working non-stop.

    Let's say we then have 50 machines, that could theoreticaly pump out 2500 builds a year, assuming working non stop. Realistically, let's make that about 1500 a year, assuming 30% roughly downtime. That should break us even.


    Last edited by _5had0w_: 31/08/21
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
0.000(0.00%)
Mkt cap ! $207.4M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 102800 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 238119 1
View Market Depth
Last trade - 16.12pm 01/11/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.