Oh, no idea how I didn't read that? I thought I had read every thing on BBI HC? Hmm. Ty.
I guess I can see how that is possible, assuming you use a figure of 60-65MT instead of 47MT, due to the nature of the take or pay contracts.
My original estimate was $2.6Bn, Range $2.4Bn-$3Bn....
I might change my estimate to most likely of $2.6Bn, with a range of $2.4Bn-$2.9Bn.
Regards,
Rhys