BRK 0.00% 1.1¢ brookside energy limited

The " ill-timed and unnecessary " Rangers CR, page-76

  1. 55 Posts.
    lightbulb Created with Sketch. 6
    IP24 flow rate is the highest rate of oil and gas produced in a day. It means daily production rate is increasing. Lets not rush and BRK management has advised that flow rate has exceeded their base estimated rate (which was 1300 BOEPD) and increasing. We want higher flow rate, but not too soon as flow rate starts declining after IP24 rate.

    It's upto the mother nature but may be by the end of this week?
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $52.50M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
31 22734224 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 38732262 25
View Market Depth
Last trade - 09.58am 28/08/2024 (20 minute delay) ?
BRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.