1.RC Drilling Results ====Yabba out
2. Reserve Estimation==== need to add yabba to **ba
3. Resource Upgrade==expected to surpass 25years
4. Pilot Study Test Work Results===new funding allows acceleration
5. Sino Steel Binding Offtake==on hold as Fe grades to be reviewed
6. Big Pawer Binding Offtake= awaiting update
7. LE Systems Binding offtake= may happen sooner as V2O5 production now closer
8. Shanxi Fengyuan Binding Offtake+only =delayed because of Covid
9. Offtake for the remainder of the GVP production(3000 Tonnes) (thinking LE systems as per the announcement slides bottom ofpage 16)==Japan in critical discussion
10. Gas Supply MOU Conversion with OPEX reductionand DFS Opex upgrade to $3.xx (APA=Yes see latest report)
11. Testwork on Non-Magnetic Tailing Confirmationof the Titanium Circuit for Yarrabubba (Improved Titanium Metrics > 50 %product)2.=expect Ti to take a expended role
Had some fun guesses here..tomorrows release may give better direction
12. Environmental Submission Approved=TBA
13. Yarrabubba DFS (Expecting Cost CAPEX AND OPEXreduction from initial bridge street estimates)= expect serious changes
14. Funding Announcement with (NAIF)=TBA
15. FID Decision for (Yarrabubba)=signfiicant new v.soon
16. VRFB Electrolyte Plant Conversion with LEsystems=the sooner the V is produced expect advances
- Forums
- ASX - By Stock
- TMT
- Ann: Trading Halt
Ann: Trading Halt, page-36
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)