LNR 0.00% 0.3¢ lanthanein resources ltd

Ann: Annual Report to Shareholders, page-2

  1. 3,676 Posts.
    lightbulb Created with Sketch. 596
    Fieldwork has determined continuity of veins Saki I, II and III from the 14 trenches dug over 214 metres
    completed to date. A total of 374 trench samples and 67 rock chip samples have been dispatched to ALS
    Laboratories in Brisbane for analysis with final results expected in
    early October.

    Next Week? I bet all those low ball dumpers wont be happy

    Next steps on the existing project portfolio: Tolukuma
    • Receive and interpret the remaining 332 trench and rock sampling assay results from the Saki veins
    collected during the June/July 2021 fieldwork program.
    • The tenement renewal application for a further two-year term is currently awaiting recommendations
    for approval by the Mineral Resources Authority. As part of the renewal process, the tenement was
    required to be reduced in size by 50%.
    • Plan fieldwork at the Seri-Seri prospect area to test soil and geophysical anomalies, extend zones of
    gold mineralisation and to define additional drill targets.
    • Seek strategic partners to more rapidly advance gold prospects within EL2531.
    • Continue to assess additional project opportunities that fit within the Company strategy.
    Now to read the REE's report

    GD
 
watchlist Created with Sketch. Add LNR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.